ACR Electronics PathFinder3 SART-3 Especificações Página 12

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 20
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 11
Y1-03-0170G 9
Pole Mounted SART
1. The PathFinder™
3
is supplied with a telescopic pole to raise the SART
one meter above sea level (see figure 6).
2. To operate, simply turn the bottom cap of the SART to release the pole.
3. Pull the pole downward and extend it to its maximum length.
4. To lock pole in position pull firmly across pole joints while twisting
slightly.
5. Tie lanyard to life raft to allow retrieval should the SART fall into the
water.
6. Push SART through life raft observation port and place foot of pole in
pocket at base of life raft.
7. Use life raft ties to hold SART pole near vertical.
8. Ensure SART is not obscured by metal objects or inflatable radar
reflectors.
9. Periodically check to see if SART is still vertical.
1 Meter
Minimum
Figure 6
Vista de página 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Comentários a estes Manuais

Sem comentários